Wednesday 3 March 2010

Bathroom 2

Work is progressing on the bathroom and, at least, we have central heating. I did manage to programme the controller so it even came on in the morning :) However as we didn't have hot water my wife and son headed off to the gym for a shower while I repeated the jug of hot water for a wash routine.

Here is the culprit for the lack of hot water waiting to be taken away and shot. (More likely repaired but I think shot would be more appropriate.) Do notice the neat wiring heading away from motorised valves - a veritable work of art.



As I type the replacement hot water cylinder is being installed :D

Here is the bath in position and the units for the toilet and handbasin in place and waiting to be installed.

No comments: